Factory Building Construction | Early 2020

Chocolate factory and Food material storage warehouse for Maritime Entrepreneurs Limited in Dhaka. Designed the building in 2017-18 and then construction started. This was the progress of construction till Covid-19 pandemic stopped everything. However everything is opening and soon the work will be restarted. Checkout the site pictures


The Design



March 04th 2020



October 9th 2019


August 8th 2019


July 18th 2019



January 01s to April 01 2019